Open Water Riser LESS Coil tubing - feasibility study

506_new.jpg

TIOS are conducting a feasibility study for the use of riser less coil tubing from a DP monohull vessel such as the Island Constructor.

These studies include the review of the vessel top side equipment and subsea well control equipment to accommodate the coil tubing operations.

It has been identified that riser less coil tubing operations can be performed from a vessel and TIOS are now looking for partners who would be willing to progress the development of the equipment and processes required.

The additional equipment required would have an impact on the vessel service rates but would be a more cost effective solution than the use of specialized vessels or drilling rigs.

TIOS AS
LAGERVEIEN 23 
NO-4033 STAVANGER


TEL: +47 51 81 71 00 | FAX: +47 51 81 71 01
POST@TIOSGROUP.COM


TIOS UK LIMITED
PAVILION 2, ASPECT 32, PROSPECT ROAD
ARNHALL BUSINESS PARK, WESTHILL 
ABERDEENSHIRE, UK, AB32 6FE


RECEPTION.ABERDEEN@TIOSGROUP.COM

 
      Copyright TIOS 2012 | Design and layout Osberget CMS